7EVM image
Deposition Date 2021-05-21
Release Date 2021-08-11
Last Version Date 2025-06-25
Entry Detail
PDB ID:
7EVM
Title:
Cryo-EM structure of the compound 2-bound human GLP-1 receptor-Gs complex
Biological Source:
Source Organism(s):
Homo sapiens (Taxon ID: 9606)
Rattus norvegicus (Taxon ID: 10116)
Bos taurus (Taxon ID: 9913)
synthetic construct (Taxon ID: 32630)
Method Details:
Experimental Method:
Resolution:
2.50 Å
Aggregation State:
PARTICLE
Reconstruction Method:
SINGLE PARTICLE
Macromolecular Entities
Polymer Type:polypeptide(L)
Molecule:Guanine nucleotide-binding pr
Gene (Uniprot):GNAS
Mutagens:S54N, G226A, E268A, N271K, K274D, R280K, T284D, I285T
Chain IDs:A
Chain Length:394
Number of Molecules:1
Biological Source:Homo sapiens
Polymer Type:polypeptide(L)
Molecule:Guanine nucleotide-binding pr
Gene (Uniprot):Gnb1
Chain IDs:B
Chain Length:345
Number of Molecules:1
Biological Source:Rattus norvegicus
Polymer Type:polypeptide(L)
Molecule:Guanine nucleotide-binding pr
Gene (Uniprot):GNG2
Chain IDs:C (auth: G)
Chain Length:70
Number of Molecules:1
Biological Source:Bos taurus
Polymer Type:polypeptide(L)
Molecule:Nanobody-35
Chain IDs:D (auth: N)
Chain Length:140
Number of Molecules:1
Biological Source:synthetic construct
Polymer Type:polypeptide(L)
Molecule:Glucagon-like peptide 1 recep
Gene (Uniprot):GLP1R
Chain IDs:E (auth: R)
Chain Length:440
Number of Molecules:1
Biological Source:Homo sapiens
Primary Citation
Molecular insights into ago-allosteric modulation of the human glucagon-like peptide-1 receptor.
Nat Commun 12 3763 3763 (2021)
PMID: 34145245 DOI: 10.1038/s41467-021-24058-z

Abstact

The glucagon-like peptide-1 (GLP-1) receptor is a validated drug target for metabolic disorders. Ago-allosteric modulators are capable of acting both as agonists on their own and as efficacy enhancers of orthosteric ligands. However, the molecular details of ago-allosterism remain elusive. Here, we report three cryo-electron microscopy structures of GLP-1R bound to (i) compound 2 (an ago-allosteric modulator); (ii) compound 2 and GLP-1; and (iii) compound 2 and LY3502970 (a small molecule agonist), all in complex with heterotrimeric Gs. The structures reveal that compound 2 is covalently bonded to C347 at the cytoplasmic end of TM6 and triggers its outward movement in cooperation with the ECD whose N terminus penetrates into the GLP-1 binding site. This allows compound 2 to execute positive allosteric modulation through enhancement of both agonist binding and G protein coupling. Our findings offer insights into the structural basis of ago-allosterism at GLP-1R and may aid the design of better therapeutics.

Legend

Protein

Chemical

Disease

Primary Citation of related structures
Feedback Form
Name
Email
Institute
Feedback