7WBS image
Deposition Date 2021-12-17
Release Date 2022-11-02
Last Version Date 2023-11-29
Entry Detail
PDB ID:
7WBS
Title:
Crystal structure of HIV-1 protease in complex with lactam derivative 2
Biological Source:
Source Organism(s):
Expression System(s):
Method Details:
Experimental Method:
Resolution:
1.85 Å
R-Value Free:
0.20
R-Value Work:
0.18
R-Value Observed:
0.18
Space Group:
P 21 21 2
Macromolecular Entities
Polymer Type:polypeptide(L)
Molecule:Protease
Chain IDs:A, B
Chain Length:0
Number of Molecules:2
Biological Source:Human immunodeficiency virus 1
Primary Citation
Pocket-to-Lead: Structure-Based De Novo Design of Novel Non-peptidic HIV-1 Protease Inhibitors Using the Ligand Binding Pocket as a Template.
J. Med. Chem. 65 6157 6170 (2022)
PMID: 35416651 DOI: 10.1021/acs.jmedchem.1c02217

Abstact

A novel strategy for lead identification that we have dubbed the "Pocket-to-Lead" strategy is demonstrated using HIV-1 protease as a model target. Sometimes, it is difficult to obtain hit compounds because of the difficulties in satisfying the complex pharmacophoric features. In this study, a virtual fragment hit which does not match all of the pharmacophore features but has key interactions and vectors that could grow into remaining pharmacophore features was optimized in silico. The designed compound 9 demonstrated weak but evident inhibitory activity (IC50 = 54 μM), and the design concept was proven by the co-crystal structure. Then, structure-based drug design promptly gave compound 14 (IC50 = 0.0071 μM, EC50 = 0.86 μM), an almost 10,000-fold improvement in activity from 9. The structure of the designed molecules proved to be novel with high synthetic feasibility, indicating the usefulness of this strategy to tackle tough targets with complex pharmacophore.

Legend

Protein

Chemical

Disease

Primary Citation of related structures
Feedback Form
Name
Email
Institute
Feedback