3EVM image
Deposition Date 2008-10-13
Release Date 2009-08-11
Last Version Date 2023-12-27
Entry Detail
PDB ID:
3EVM
Keywords:
Title:
Crystal structure of the Mimivirus NDK +Kpn-N62L-R107G triple mutant complexed with dCDP
Biological Source:
Source Organism(s):
Expression System(s):
Method Details:
Experimental Method:
Resolution:
1.80 Å
R-Value Free:
0.21
R-Value Work:
0.17
R-Value Observed:
0.17
Space Group:
P 63
Macromolecular Entities
Polymer Type:polypeptide(L)
Molecule:Nucleoside diphosphate kinase
Gene (Uniprot):NDK
Mutagens:+Kpn, N62L, R107G
Chain IDs:A, B
Chain Length:146
Number of Molecules:2
Biological Source:Acanthamoeba polyphaga mimivirus
Primary Citation
Dissecting the unique nucleotide specificity of mimivirus nucleoside diphosphate kinase.
J. Virol. 83 7142 7150 (2009)
PMID: 19439473 DOI: 10.1128/JVI.00511-09

Abstact

The analysis of the Acanthamoeba polyphaga mimivirus genome revealed the first virus-encoded nucleoside diphosphate kinase (NDK), an enzyme that is central to the synthesis of RNA and DNA, ubiquitous in cellular organisms, and well conserved among the three domains of life. In contrast with the broad specificity of cellular NDKs for all types of ribo- and deoxyribonucleotides, the mimivirus enzyme exhibits a strongly preferential affinity for deoxypyrimidines. In order to elucidate the molecular basis of this unique substrate specificity, we determined the three-dimensional (3D) structure of the Acanthamoeba polyphaga mimivirus NDK alone and in complex with various nucleotides. As predicted from a sequence comparison with cellular NDKs, the 3D structure of the mimivirus enzyme exhibits a shorter Kpn loop, previously recognized as a main feature of the NDK active site. The structure of the viral enzyme in complex with various nucleotides also pinpointed two residue changes, both located near the active site and specific to the viral NDK, which could explain its stronger affinity for deoxynucleotides and pyrimidine nucleotides. The role of these residues was explored by building a set of viral NDK variants, assaying their enzymatic activities, and determining their 3D structures in complex with various nucleotides. A total of 26 crystallographic structures were determined at resolutions ranging from 2.8 A to 1.5 A. Our results suggest that the mimivirus enzyme progressively evolved from an ancestral NDK under the constraints of optimizing its efficiency for the replication of an AT-rich (73%) viral genome in a thymidine-limited host environment.

Legend

Protein

Chemical

Disease

Primary Citation of related structures
Feedback Form
Name
Email
Institute
Feedback