2evm image
Deposition Date 2005-10-31
Release Date 2006-03-28
Last Version Date 2023-08-23
Entry Detail
PDB ID:
2EVM
Keywords:
Title:
crystal structure of methionine aminopeptidase in complex with 5-(2,5-dichlorophenyl)furan-2-carboxylic acid
Biological Source:
Source Organism(s):
Escherichia coli (Taxon ID: 562)
Expression System(s):
Method Details:
Experimental Method:
Resolution:
1.70 Å
R-Value Free:
0.24
R-Value Work:
0.21
R-Value Observed:
0.23
Space Group:
P 1 21 1
Macromolecular Entities
Polymer Type:polypeptide(L)
Molecule:Methionine aminopeptidase
Gene (Uniprot):map
Chain IDs:A
Chain Length:264
Number of Molecules:1
Biological Source:Escherichia coli
Primary Citation
Structural analysis of metalloform-selective inhibition of methionine aminopeptidase.
Acta Crystallogr. D Biol. Crystallogr. 62 425 432 (2006)
PMID: 16552144 DOI: 10.1107/S0907444906003878

Abstact

One of the challenges in the development of methionine aminopeptidase (MetAP) inhibitors as antibacterial and anticancer agents is to define the metal ion actually used by MetAP in vivo and to discover MetAP inhibitors that can inhibit the metalloform that is relevant in vivo. Two distinct classes of novel nonpeptidic MetAP inhibitors that are not only potent but also highly selective for either the Mn(II) or Co(II) form have been identified. Three crystal structures of Escherichia coli MetAP complexed with the metalloform-selective inhibitors 5-(2,5-dichlorophenyl)furan-2-carboxylic acid (2), 5-[2-(trifluoromethyl)phenyl]furan-2-carboxylic acid (3) and N-cyclopentyl-N-(thiazol-2-yl)oxalamide (4) have been solved and analysis of these structures has revealed the structural basis for their metalloform-selective inhibition. The Mn(II)-form selective inhibitors (2) and (3) both use their carboxylate group to coordinate with the two Mn(II) ions at the dinuclear metal site and both adopt a non-coplanar conformation for the two aromatic rings. The unique coordination geometry of these inhibitors may determine their Mn(II)-form selectivity. In contrast, the Co(II)-form selective inhibitor (4) recruits an unexpected third metal ion, forming a trimetallic enzyme-metal-inhibitor complex. Thus, an important factor in the selectivity of (4) for the Co(II) form may be a consequence of a greater preference for a softer N,O-donor ligand for the softer Co(II).

Legend

Protein

Chemical

Disease

Primary Citation of related structures
Feedback Form
Name
Email
Institute
Feedback