2WBS image
Deposition Date 2009-03-03
Release Date 2010-04-07
Last Version Date 2024-05-08
Entry Detail
PDB ID:
2WBS
Title:
Crystal structure of the zinc finger domain of Klf4 bound to its target DNA
Biological Source:
Source Organism(s):
MUS MUSCULUS (Taxon ID: 10090)
Expression System(s):
Method Details:
Experimental Method:
Resolution:
1.70 Å
R-Value Free:
0.23
R-Value Work:
0.20
R-Value Observed:
0.20
Space Group:
P 21 21 21
Macromolecular Entities
Polymer Type:polypeptide(L)
Molecule:KRUEPPEL-LIKE FACTOR 4
Gene (Uniprot):Klf4
Chain IDs:A
Chain Length:89
Number of Molecules:1
Biological Source:MUS MUSCULUS
Polymer Type:polydeoxyribonucleotide
Molecule:5'-D(*GP*AP*GP*GP*CP*GP*CP)-3
Chain IDs:B (auth: F)
Chain Length:7
Number of Molecules:1
Biological Source:MUS MUSCULUS
Polymer Type:polydeoxyribonucleotide
Molecule:5'-D(*GP*CP*GP*CP*CP*TP*CP)-3
Chain IDs:C (auth: G)
Chain Length:7
Number of Molecules:1
Biological Source:MUS MUSCULUS
Primary Citation
The Structure of the Klf4 DNA-Binding Domain Links to Self-Renewal and Macrophage Differentiation.
Cell. Mol. Life Sci. 68 3121 ? (2011)
PMID: 21290164 DOI: 10.1007/S00018-010-0618-X

Abstact

Krueppel-like factor 4 (Klf4) belongs to the Sp/Klf family of zinc-finger transcription factors and is indispensable for terminal maturation of epithelial tissues. Furthermore, it is part of a small set of proteins that are used to generate pluripotent embryonic stem cells from differentiated tissues. Herein, we describe that a Klf4 zinc-finger domain mutant induces self-renewal and block of maturation, while wild-type Klf4 induces terminal macrophage differentiation. Moreover, we present the crystal structure of the zinc-finger domain of Klf4 bound to its target DNA, revealing that primarily the two C-terminal zinc-finger motifs are required for site specificity. Lack of those two zinc fingers leads to deficiency of Klf4 to induce macrophage differentiation. The first zinc finger, on the other hand, inhibits the otherwise cryptic self-renewal and block of differentiation activity of Klf4. Our data show that impairing the DNA binding could potentially contribute to a monocytic leukemia.

Legend

Protein

Chemical

Disease

Primary Citation of related structures
Feedback Form
Name
Email
Institute
Feedback