1WBS image
Deposition Date 2004-11-05
Release Date 2005-11-03
Last Version Date 2024-05-08
Entry Detail
PDB ID:
1WBS
Keywords:
Title:
Identification of novel p38 alpha MAP Kinase inhibitors using fragment-based lead generation.
Biological Source:
Source Organism(s):
HOMO SAPIENS (Taxon ID: 9606)
Expression System(s):
Method Details:
Experimental Method:
Resolution:
1.80 Å
R-Value Free:
0.23
R-Value Work:
0.19
R-Value Observed:
0.19
Space Group:
P 21 21 21
Macromolecular Entities
Polymer Type:polypeptide(L)
Molecule:MITOGEN-ACTIVATED PROTEIN KIN
Gene (Uniprot):MAPK14
Chain IDs:A
Chain Length:360
Number of Molecules:1
Biological Source:HOMO SAPIENS
Primary Citation
Identification of Novel P38Alpha Map Kinase Inhibitors Using Fragment-Based Lead Generation.
J. Med. Chem. 48 414 ? (2005)
PMID: 15658855 DOI: 10.1021/JM049575N

Abstact

We describe the structure-guided optimization of the molecular fragments 2-amino-3-benzyloxypyridine 1 (IC(50) 1.3 mM) and 3-(2-(4-pyridyl)ethyl)indole 2 (IC(50) 35 microM) identified using X-ray crystallographic screening of p38alpha MAP kinase. Using two separate case studies, the article focuses on the key compounds synthesized, the structure-activity relationships and the binding mode observations made during this optimization process, resulting in two potent lead series that demonstrate significant increases in activity. We describe the process of compound elaboration either through the growing out from fragments into adjacent pockets or through the conjoining of overlapping fragments and demonstrate that we have exploited the mobile conserved activation loop, consisting in part of Asp168-Phe169-Gly170 (DFG), to generate significant improvements in potency and kinase selectivity.

Legend

Protein

Chemical

Disease

Feedback Form
Name
Email
Institute
Feedback