
New TopShim run:

version = topshim 2.1.0
date = 2023-11-13
time = 23:24:11.304
command = topshim 

FINE SHIMMING

Parameters:

probe = Z75811_0017
solvent = H2O+D2O_salt
shim nucleus = 1H
nucleus optimised for = 1H
o1p (from lock) = 4.70 ppm

Results:


1D Shimming:
Iteration 1: FWHM Before= 0.8 Hz, Target= 0.2 Hz, After= 0.5 Hz
Iteration 2: FWHM Before= 0.5 Hz, Target= 0.2 Hz, After= 0.3 Hz
Iteration 3: FWHM Before= 0.3 Hz, Target= 0.2 Hz, After= 0.5 Hz
Iteration 4: FWHM Before= 0.5 Hz, Target= 0.2 Hz, After= 0.4 Hz
Iteration 5: FWHM Before= 0.4 Hz, Target= 0.2 Hz, After= 0.3 Hz
Iteration 6: FWHM Before= 0.3 Hz, Target= 0.2 Hz, After= 0.4 Hz
Slow convergence detected. Shimming was aborted.
Using the best result as the final shim state.

Lineshape quality factor (1D spectrum, non-spinning) = 0.38

shim changes: 
Z2	+1
Z3	+26
Z4	+102
Z5	-153
Z6	-696
Z7	+1484
Z8	+4252

duration = 50 sec
completed successfully
finished Mon Nov 13 23:24:59 2023


========================================================================
